02 / Calculation & review
Terrain leads.
Engineering review follows.
DEM-derived results form the calculation basis. Optional external comparisons help identify differences without silently replacing the terrain analysis.
01 / DefineControl the inputs
Record the terrain, rainfall, outlets, methods and settings used for the study.
02 / CalculateFollow the actual work
Progress tracks processing stages and available work counts. Valid results identify unresolved outlets and omitted outputs.
03 / ReviewDocument the decision
Inspect crossings, compare opening options and record notes or photographs. Technical changes require recomputation.
Engineering scope: hydrologic assessment and preliminary drainage screening. Opening checks do not replace detailed inlet/outlet-control analysis, flood modelling, structural design or project-specific approval.